Termite Bait Station Quantity Estimator

Counts how many in-ground termite bait stations a job needs from the linear feet of foundation you measure, rounded up so no gap exceeds the spacing.

How do you want to enter the footprint?
Measurement units

Total length around the foundation.

10 ft

Most termite labels use ~10 ft; widen up to 20 ft per your product label.

Add interior stations

Adds 1 station per 1,000 sq ft of interior floor area you want to monitor.

Extras & cost

Add stations near known activity, moisture, or wood-to-soil contact (typically 6–9).

Optional — your per-station price; we never assume one.

Total stations

Enter your foundation perimeter to size your kit.

Perimeter stations
Interior stations
High-risk extras
Total stations

In-ground termite bait stations

Export
How this is calculated

Walk the foundation with a tape, enter the perimeter (or the house length and width), and we divide by your spacing interval and round up. Rounding up is the whole point: flooring would leave a gap larger than the maximum recommended spacing, so a fractional result always becomes the next whole station. Interior monitoring adds 1 station per 1,000 sq ft; high-risk extras are a pass-through count you choose for your property.

perimeter (dimensions mode) = 2 × (length + width)

perimeter stations = ceil(perimeter ÷ spacing)
interior stations  = ceil(interior area ÷ 1,000 sq ft)   (when enabled)
high-risk extras   = your number (pass-through)

total stations     = perimeter + interior + extras
estimated cost     = total × cost per station             (when a price is set)

Round-up rule and 10 ft default follow Engineer Fix and NailTheQuote; the 1-per-1,000-sq-ft interior density follows NailTheQuote; the 6–9 high-risk extras band and the 1–3 ft foundation offset follow Defender Pest and Engineer Fix. Spacing and offset are label-dependent — these are industry-typical starting figures, not a compliance number.

A baiting system is almost always sold as a monitored, renewable program rather than a one-off install, so the station count feeds the pricing page for a monitored renewable program, which covers the initial fee and the renewal behind the monitoring visits. Where the job is a liquid barrier poured at construction, the pre-construction barrier bid runs per square foot instead. The inspection that usually precedes either one is priced by the WDO inspection pricing calculator.

Sources

  1. Bait Station Spacing Calculator. NailTheQuote. Retrieved .
  2. How Many Termite Bait Stations Do I Need?. Engineer Fix. Retrieved .