Termite Bait Station Quantity Estimator
Counts how many in-ground termite bait stations a job needs from the linear feet of foundation you measure, rounded up so no gap exceeds the spacing.
How this is calculated
Walk the foundation with a tape, enter the perimeter (or the house length and width), and we divide by your spacing interval and round up. Rounding up is the whole point: flooring would leave a gap larger than the maximum recommended spacing, so a fractional result always becomes the next whole station. Interior monitoring adds 1 station per 1,000 sq ft; high-risk extras are a pass-through count you choose for your property.
perimeter (dimensions mode) = 2 × (length + width)
perimeter stations = ceil(perimeter ÷ spacing)
interior stations = ceil(interior area ÷ 1,000 sq ft) (when enabled)
high-risk extras = your number (pass-through)
total stations = perimeter + interior + extras
estimated cost = total × cost per station (when a price is set) Round-up rule and 10 ft default follow Engineer Fix and NailTheQuote; the 1-per-1,000-sq-ft interior density follows NailTheQuote; the 6–9 high-risk extras band and the 1–3 ft foundation offset follow Defender Pest and Engineer Fix. Spacing and offset are label-dependent — these are industry-typical starting figures, not a compliance number.
A baiting system is almost always sold as a monitored, renewable program rather than a one-off install, so the station count feeds the pricing page for a monitored renewable program, which covers the initial fee and the renewal behind the monitoring visits. Where the job is a liquid barrier poured at construction, the pre-construction barrier bid runs per square foot instead. The inspection that usually precedes either one is priced by the WDO inspection pricing calculator.
Sources
- Bait Station Spacing Calculator. NailTheQuote. Retrieved .
- How Many Termite Bait Stations Do I Need?. Engineer Fix. Retrieved .
- Termite Bait Station Installation: Tools, Spacing & Costs. Defender Pest. Retrieved .