Termite Pretreatment Pricing Calculator: what to bid per square foot
Bid a new-construction termite pretreat from your own numbers: slab square feet, footing run, mobilisations, termiticide cost, a builder discount, a job minimum and a margin check.
How this is calculated
The bid is a straight build-up from what you measured and the rates you set. Two things behave deliberately: mobilisation is multiplied by the trip count, because a pre-construction treatment is normally not one visit, and the headline per-square-foot figure is derived from the finished bid rather than from the rate box, because that is the number a builder compares bids on.
slab = slabSqft × pricePerSqft
footing = footingFt × pricePerFt
mobilise = trips × perTripCharge
materials = (termiticide + otherMaterials) × (1 + markup)
subtotal = slab + footing + mobilise + materials
discount = subtotal × builderDiscount
bid = max(subtotal − discount, jobMinimum)
perSqFt = bid ÷ slabSqft
tax = bid × taxRate
paidHours = (onSitePerTrip + drivePerTrip) × crewSize × trips
cost = paidHours × costRate + materialsAtCost
margin = (bid − cost) ÷ bid
annual = bid × slabsPerYear Worked example. A 2,000 sq ft slab bid at 0.50 a square foot is 1,000. Add 180 linear feet of footing and foundation wall at 1.25 a foot, that is 225. Two mobilisations at 75 each add 150. Termiticide at 120 and other materials at 30 come to 150 at cost, or 180 with 20 percent on them. The bid is 1,555 before tax, which divides out to 0.78 a square foot, not the 0.50 in the rate box. At two hours on site and half an hour of drive per trip with a crew of two, the job eats 10 crew-hours, so it returns 155.50 a crew-hour.
No price presets anywhere. Every currency field starts empty. The only pre-filled number is the trip count, and it sits in an editable box: two is the pre-pour and final-grade pair, offered as a scoping starting point rather than as a statement about any label or code requirement. Your scope of work and the product label decide the real number.
The unit toggle moves the rate with the quantity. Switch the slab to square metres and the rate box becomes a rate per square metre; switch the footing run to metres and its rate becomes a rate per metre. Both cross back to square feet and linear feet in one place, at the form edge, so a metric measurement can never be multiplied by an imperial rate. Square feet and linear feet are canonical here because the contract language, the keyword and every sibling termite calculator on this site are imperial-native.
This page prices, it does not dose. Nothing here computes, recommends or implies an application rate. Gallons of finished dilution for the horizontal barrier come from the slab pre-treatment coverage calculator, and how far a bottle of concentrate goes comes from the termiticide concentrate yield calculator. Take the cost those produce and bring it back here as one line. The product label is the authority on rate, dilution and method, every time.
Everything runs in your browser. No account, no email gate, nothing stored or sent.
What this prices, and what it deliberately does not
This is the pricing rung of the termite pretreat entity, and it does one job: turn a builder’s slab into a bid you can hand over and still make money on. It does not size the treatment. Finished gallons for the horizontal barrier come from the slab pre-treatment coverage calculator, including the coarse-fill bump that most calculators miss, and how many bottles a job draws down comes from the termiticide concentrate yield calculator. Work the chemistry there, against the label in front of you, then bring the cost back here as one line.
The wider map of termite sizing tools, and which yardstick each treatment method is measured in, is the termite and WDO treatment hub. Start there if you are not sure whether the job in front of you is a linear-foot job or a square-foot one.
Every money field starts empty on purpose
A pretreat rate is an account rate. It is negotiated between you and a builder, it moves with volume and schedule reliability, and nobody publishes it. Search for an average anyway and the results resolve to lead-generation directories quoting each other: no regulator, no trade body, no published survey. Under this site’s cite-or-omit rule that means no average appears here, and none was invented to fill the space. Every currency field starts blank.
The only pre-filled number anywhere is the trip count, and it sits in an editable box. If you have not yet set a defensible cost per crew-hour to type into the margin check, the labor burden rate calculator is where that number comes from.
The rate box is not the rate the builder compares
This is the useful part of the arithmetic. You bid a rate per square foot, but the builder divides your total by the slab, and that total has mobilisation, footings and materials inside it. A 2,000 square foot slab bid at fifty cents a foot is a thousand dollars of slab line, but add 180 feet of footing, two mobilisations and the termiticide and the bid divides out closer to seventy-eight cents. The tool shows both, so you are never surprised by your own number in a bid comparison.
Mobilisation is multiplied, because the job is
A pre-construction treatment is normally two visits: the barrier before the pour, then the perimeter work after backfill and final grade. Price one and the second trip is free, which is where builder work quietly loses its margin. The trips box is an input rather than a rule, so a scope that genuinely ends at the pre-pour visit prices honestly too, but the tool will tell you which one you just bid.
The same logic runs through the crew-time panel. Those hours never reach the charge side, because you are bidding per square foot rather than per hour. They are there so the tool can tell you what the bid returns per paid crew-hour once the drive to a site three towns over is counted twice.
Judge the discount by the year
Builder work is volume work, and volume work is where a discount gets agreed in a conversation and paid for over a season. Enter the number of slabs the builder expects to run and the tool puts an annual figure on both the revenue and, once you have given it a cost per crew-hour, the gross profit. That is the number to decide on.
If the account follows the slab into an ongoing warranty, the termite bond pricing calculator prices what comes next, and the termite trench gallons calculator is the sizing tool for post-construction work on a house that is already standing.
Everything runs in your browser: no account, no email gate, nothing stored or sent. Estimate only, not a binding bid, and the product label is the authority on rate, dilution and method.