Structural Fumigation Volume Calculator: Cubic Feet and How Much to Charge

Size a tent fumigation section by section in cubic feet, then price the job from your own rate per 1,000 ft³, minimum charge, and add-on lines.

Measure in
Living area
Entry mode

Livable / conditioned floor area. Measure from exterior eaves — the trade measures enclosed volume from outside.

Default 8 ft (standard US residential ceiling).

Pitched attic
Foundation
Foundation type
Attached garage
Patios / carports

Optional. Add a row for each attached patio or carport (length × width × height).

LengthWidthHeight Actions
Job price: how much to charge

Every figure below is yours. We publish no market rate for tent fumigation, because no regulator or trade body publishes one, so these boxes ship empty on purpose: anything shown in grey is a placeholder you must replace with your own price before quoting.

Your own charge per 1,000 cubic feet of enclosed volume.

The floor the volume charge never drops below. Add-ons are added after it.

Add-on line items (optional)

Total enclosed volume

Enter the living area to size the structure. Add the attic, crawlspace, garage, and patios for a full enclosed volume.

Total enclosed volume

Per-section breakdown

Export
How this is calculated

A real house is not one box. We sum the main living area, a pitched attic (taken at half its bounding box to approximate the triangular cross-section), a raised-foundation crawlspace, an attached garage, and any patios or carports into one total enclosed volume. Tent fumigation is priced per 1,000 ft³, so we also show the thousand-ft³ figure that sizes the quote.

living   = sqft × ceiling           (or L × W × H)
attic    = L × W × ridge ÷ 2        (half of the bounding box)
crawl    = L × W × height           (raised foundation only)
garage   = L × W × H
patios   = Σ (L × W × H)
total    = living + attic + crawl + garage + patios
priced   = total ÷ 1,000            (the fumigation pricing unit)

The price: the volume charge is the thousand-ft³ figure at your own rate. Your minimum is a floor on that charge, and the add-on lines you enter are added after the floor, so a minimum can never swallow work you quoted separately. The effective rate tells you what the finished job actually earns per 1,000 ft³ once the minimum and the add-ons are in.

volume charge   = (total ÷ 1,000) × your rate per 1,000 ft³
base charge     = max(volume charge, your minimum charge)
add-ons         = Σ (tarp, monitoring, clearance, other)
job price       = base charge + add-ons
effective rate  = job price ÷ (total ÷ 1,000)

Worked example (illustrative figures an operator typed, not a market rate): a 40 × 60 × 12 ft structure is 28,800 ft³, or 28.8 thousand ft³. At an operator-entered 150 per 1,000 ft³ the volume charge is 28.8 × 150 = 4,320. Add tarp 400, monitoring 250 and clearance 175 and the add-ons come to 825, so the job price is 4,320 + 825 = 5,145. The minimum case: a 3,200 ft³ job at the same 150 per 1,000 ft³ is only 480, so a 950 minimum floors the base at 950, and a 400 tarp line on top makes the job price 1,350. Both figures are arithmetic on numbers the operator supplied: we publish no rate, no minimum and no add-on price.

Where the price numbers come from: you. There is no published, verifiable market rate for structural fumigation, so this tool ships none and invents none. The rate, the minimum and every add-on are your own figures, and the arithmetic is the only thing we supply.

Measure enclosed volume from the exterior eaves — the trade measures from outside; interior-only dimensions under-size the tent. The attic ÷2 is a symmetric-gable approximation (it averages ridge height to the eave) — hip and complex roofs are over- or under-estimated. Per-section formulas follow Homesteady's "How to Calculate Cubic Feet for Fumigation" and GC Termite Control's measuring guide (the 60 × 30 × 8 = 14,400 ft³ and 40 × 60 × 12 = 28,800 ft³ worked examples). This is a cubic-footage worksheet that sizes the job — it emits no fumigant quantity; the EPA-registered product label governs the dose.

Where the label classifies the product as a restricted-use pesticide, the certification category, the supervision and the record-keeping that go with that classification apply to the whole job, not just the dose. Clearance and re-occupancy are their own step, and the re-entry interval timer turns the interval you read off the label into a posted date and time. On the commercial side of a drywood job, whole-structure work is usually quoted against the alternatives, which the termite treatment cost estimator lays out, with any renewable warranty priced by the what a renewable warranty costs to carry.

Sources

  1. How to Calculate Cubic Feet for Fumigation. Homesteady. Retrieved .
  2. Measuring Your Property for Structural Fumigation. GC Termite Control. Retrieved .
  3. Structural Fumigation Volume Calculator. GC Termite Control. Retrieved .

Get early access

Fieldwynn is the field-first app we are building for small crews — simple in the truck, powerful in the back office. It is not out yet; join the early-access list and be first when it launches for your trade.