Hydroseeding Pricing Calculator

Price a hydroseeding job from tank loads: slurry loads, seed, mulch and tackifier at cost, crew time per load, travel and a job minimum. No price presets.

The area you measured

Measure the ground that gets sprayed. Beds, the driveway and the house footprint come out.

A starting placeholder, not a published figure: your machine, your slurry loading and your nozzle set it. Work it out from a job you have measured.

A placeholder, not a spec: your machine plate is the authority. Nothing in the price depends on it, it reports the slurry the job mixes.

Your rates and crew

What you bill one crew-hour at, not what it costs you.

The per-load time below is for ONE person. Crew size multiplies it.

A floor the ex-tax quote never falls below. Leave empty for no minimum.

Time per tank load (per person)

A scoping placeholder, not a measured production rate. Time your own first three jobs and overwrite it.

Masking, raking, a long hose pull, a water source that is not on site.

Drive time

Per person, door to door. Water and material runs are extra loads, not drive time.

Most operators bill none of it. Either way it stays in your cost, which is the point.

Slurry materials (at cost)

On: material is sized on the ground the loads cover, because a tank is mixed whole and what stays in it is paid for. Off: material is sized on the measured area only.

Off the seed label or your species rate. This page prices, it never doses.

Seeding rates by species, in this same unit: grass seed calculator.

Wood or paper fibre, off the bag. The rate you spray for erosion control is not the rate you spray on a flat lawn.

Off the tackifier data sheet. Leave at 0 when the mulch already carries one.

Starter fertilizer, lime, dye, hauled water. A cost line only.

Applied to every cost line in this block. Leave at 0 to pass them on at cost.

A straw blanket on a slope, an irrigation repair, a follow-up watering visit.

Tax line and margin check

VAT, GST or sales tax, if you add one. Use your own registered rate: the tool does not assume a country.

Loaded crew cost, wage plus burden. Fill it in and the result shows job cost, gross profit and realised margin. Leave it empty and the margin block stays hidden.

Quote before tax

Enter an area and a charge-out rate to build the quote.

Hydroseeding crew time
Slurry materials
Quote before tax
Export
How this is calculated

The quote is a straight build-up from the area you measured, with the tank load as the unit the work is actually done in. Three things behave deliberately: loads round up, because a tank is mixed whole, so the tool prints how much ground the last load covers off the lawn and sizes the material on the mixed area unless you tell it otherwise; crew time scales with loads rather than area, because filling, mixing and rinsing is the same work whether a load sprays 2,000 or 3,000 sq ft; and drive time is tracked twice, landing in your cost in full and in the charge only for the share you choose to bill.

loads      = ceil(area ÷ coveragePerLoad)
mixedArea  = loads × coveragePerLoad
spare      = mixedArea − area
matArea    = mixWholeTanks ? mixedArea : area
lbs        = (matArea ÷ 1,000) × ratePer1000        (seed, mulch, tackifier)
materials  = (Σ lbs × pricePerLb + other) × (1 + markup)
onSite     = loads × hoursPerLoad + extra
crewHours  = onSite × crewSize
driveCrew  = driveHours × crewSize
billedDrv  = driveCrew × driveBillPct
labour     = (crewHours + billedDrv) × chargeRate
quote      = max(labour + materials + addOns, jobMinimum)
perSqFt    = quote ÷ area
perLoad    = quote ÷ loads
tax        = quote × taxRate
cost       = (crewHours + driveCrew) × costRate + materialsAtCost
margin     = (quote − cost) ÷ quote

Worked example, the one the unit tests pin. A 10,000 sq ft lawn with a machine that covers 3,000 sq ft a load is 4 loads: 12,000 sq ft of slurry mixed, so 2,000 sq ft of it lands off the measured lawn. At 6, 45 and 3 lb per 1,000 sq ft that is 72 lb of seed, 540 lb of mulch and 36 lb of tackifier; at $4.00, $0.55 and $3.50 a pound plus $40 of fertilizer the materials cost $751, and marked up 15% they are charged at $863.65. At 0.75 hours a load plus half an hour of setup the job is 3.5 hours for one person, 7 crew-hours for two, and a further 1 paid crew-hour of drive. At $65 a crew-hour that is $455 of labour, so the quote lands at $1,318.65 before tax: about $0.13 per square foot, $329.66 a load and $164.83 per paid crew-hour. Put $45 a crew-hour of cost against it and the realised margin is 15.7%.

Why there is no seed, mulch or tackifier rate pre-filled. Those three numbers are a dosing decision, and the seed label, the hydromulch bag and the tackifier data sheet are the authority on them. A rate invented here would be a claim this page has no business making, so the boxes start empty. If you need the seeding rate for a species, the grass seed calculator carries the extension-cited figures in the same lb per 1,000 sq ft unit this page uses.

Coverage per load and time per load are placeholders, not benchmarks. Nothing published states how much ground one tank covers or how long a load takes, and it would not be one number if it did: coverage moves with your mulch rate, your machine and your nozzle, and load time moves with the water source and the hose pull. Both sit in editable boxes so the page has a shape on first load. Time and measure your own first three jobs, overwrite them, and the rest of the model becomes yours.

The margin check is all-or-nothing. With no cost per crew-hour the labour half of the job cost is unknown, so reporting a margin off the materials line alone would flatter every quote. Fill the box and the block appears; leave it empty and it stays hidden.

Everything runs in your browser. No account, no email gate, nothing stored or sent.

What this prices, and what it deliberately does not

Hydroseeding is priced badly more often than it is priced wrong, because the number most operators reach for is a rate per square foot they read somewhere. This calculator builds the quote the other way around: from the ground you measured, the tank loads that ground takes, the material those loads carry at your cost, and the crew-hours the loads consume. Then it runs the two checks a flat per-foot price hides, what the job returns per paid crew-hour and what the realised margin is once your crew’s loaded cost is set against it.

The load count is an intermediate line inside the price, not a takeoff. The tool counts loads because the labour and the material both scale with them, prints how much slurry the job mixes, and stops. If you want the ground measured first, the lawn area calculator runs the shape formulas and hands you the square footage this page starts from.

Every money field starts empty on purpose

Search for a hydroseeding price and you get two kinds of page: homeowner cost articles quoting each other, and equipment-vendor calculators pricing the finished job for the person buying it. Neither is an operator’s build-up, and nothing published by a regulator or a trade body sets an installed rate. Under this site’s cite-or-omit rule the tool ships with none of those figures, and it never presents a default as a market fact.

The material rates are blank for a different reason. The seed label, the hydromulch bag and the tackifier data sheet are the authority on how much of each goes in the tank, and a rate invented here would be a dosing claim this page has no business making. If you need a seeding rate by species, the grass seed calculator carries the extension-cited figures in the same pounds per 1,000 square feet unit the seed line here expects.

Coverage per load and time per load are the two numbers to make yours

Two boxes are pre-filled so the page has a shape on first load: how much ground one tank covers, and how long a load takes one person. Both are placeholders rather than benchmarks. Coverage moves with your mulch rate, your machine and your nozzle, and it drops the moment you thicken the slurry for a slope. Load time moves with the water source, the hose pull and whether the truck can get near the work.

Measure them once. Spray a job you have measured and divide, time three loads with a phone, then overwrite both boxes. From that point the rest of the model is yours rather than a sketch.

A tank is mixed whole, and that is a real cost

The coupling the tool refuses to hide: loads round up. A 10,000 square foot lawn at 3,000 square feet a load is four loads, which is 12,000 square feet of slurry, so 2,000 square feet of mixed material lands past the lawn. By default the seed, mulch and tackifier lines are sized on the ground the loads cover, because that is what actually goes in the tank and gets paid for. The page says how much of it lands off the job, and a single tick box sizes the material on the measured area instead when you genuinely carry the remainder to the next stop.

The second coupling is time. Crew hours come off the load count, not the area, because the fill, the mix and the rinse do not get shorter on a small lawn. That is why a scattering of small hydroseed jobs can fill a week and return less than one large one, and why the per-paid-crew-hour line on this page is worth more attention than the per-square-foot line under it.

Drive time is the line that decides a busy spring

Hydroseeding arrives in short seasonal bursts and the crew is paid for the whole day, windshield included. The tool tracks drive hours twice: they always land in your cost, because you pay for them either way, and only the share you nominate lands in the charge. Water runs and material runs are not drive time here, they are extra loads and extra load hours, which is where they belong.

The other way to establish a lawn

A customer choosing between hydroseed and sod is choosing between a cheap fast job with a wait and an expensive fast job with no wait, and it helps to have both numbers. Price the alternative on the sod installation pricing calculator, which builds the same way from pallets, tear-out and crew hours. If either job needs the grade built up first, the topsoil calculator sizes the cubic yards and you bring the cost back here as the materials line. This page prices the job, it does not size the soil.

Everything runs in your browser: no account, no email gate, nothing stored or sent. Estimate only, not a binding quote, and the product label and your machine manual are the authority on what goes in the tank.

Frequently asked questions

How much should I charge for hydroseeding?
Whatever your own build-up says, which is why every currency box on this page starts empty. The hydroseeding prices you can find are homeowner cost pages and equipment-vendor calculators pricing a finished job, not an operator quote, and no regulator or trade body publishes an installed rate. What the tool supplies instead is the structure a hydroseed quote needs: the area you measured, the tank loads it takes, seed, mulch and tackifier at your cost with your markup, crew time per load, travel, a job minimum and a margin check against your own cost per crew-hour.
Why does the price build on tank loads instead of square feet?
Because the load is the unit the work is actually done in. Filling, mixing, agitating, spraying out and rinsing is roughly the same job whether a tank covers 2,000 or 3,000 square feet, so crew time tracks loads rather than area, and a tank is mixed whole so the last one usually covers ground that is not in the lawn. The tool counts the loads, prices them, and stops there. The per-square-foot figure it prints at the end is an output of your build-up, never an input you look up.
How is this different from the grass seed calculator?
Different method and a different rung. The grass seed calculator sizes dry seed for broadcast seeding and answers how many pounds and bags to buy. Hydroseeding sprays seed, mulch and tackifier as a slurry, and this page answers what to charge for doing it. The two share a unit on purpose: seeding rates are in pounds per 1,000 square feet on both pages, so a rate you take off the species table there drops straight into the seed line here.
What seed, mulch and tackifier rates should I use?
The ones on the label, which is why none of the three is pre-filled. Seeding rate is a species decision, hydromulch loading is a bag decision, and tackifier is a data-sheet decision, so a number invented on this page would be a dosing claim it has no business making. Enter the rates you actually spray. The tool multiplies them by the area the loads cover, prices the pounds at your cost, and applies whatever markup you set.
Should I price the material for the whole tank or only for the lawn?
For the tank, in most cases, and the tool defaults that way. Slurry is mixed whole and what stays in the tank at the end of the job is paid for whether or not it reached the grass, so sizing the material on the ground the loads cover is the honest version. Untick mix whole tanks and the material is sized on the measured area alone, which suits an operator who carries the remainder to the next job on the same day. Either way the page says how much slurry lands past the lawn.
How do I turn this into a per-acre bid?
Enter the acre in square feet, or switch the unit toggle to metric and enter hectares as square metres, and read the finished quote. An acre is 43,560 square feet, so at 3,000 square feet a load it is 15 loads, which is what sets both the crew time and the material. Resist the per-acre rate of thumb the other direction: the same acre behind a locked gate with a 300-foot hose pull and no water on site is a different number of paid crew-hours, and that is the figure your margin lives on.

Get early access

Fieldwynn is the field-first app we are building for small crews — simple in the truck, powerful in the back office. It is not out yet; join the early-access list and be first when it launches for your trade.